The Carriglea development is located south-west of Dublin City. The whole development consists of 371 apartments within 10 residential blocks ranging in height from four to seven storeys.
However, Phase 1 consist of 4 blocks, while our office was responsible for general assembly and production drawings of precast for 3 blocks. Almost whole superstructure of the building was designed and made as precast concrete, besides ground floor that was cast in place and steel beams and columns supporting floor slab in some locations. Precast walls are made as 200mm thick solid panels, while floor slab consist of 250mm thick hollow core slab with 75mm structural screed on top.
Thanks to the usage of BIM technology we were able to solve quickly design issues. What is more, we were leading remote online design team meetings regarding precast structure showing 3D model, that was very helpful for the coordination. Also, with this we were able to provide quickly precise list of materials and quantity schedules.
Project name: | Carriglea Phase 1 |
---|---|
Location: | Dublin |
Purpose: | Residential |
Number of floors: | Block 1: 6 storeys Block 2: 6 storeys Block 3: 6 storeys |
Area of walls gross/net: | Blok 1: 4471/3657 m2 Blok 2: 3970/3273 m2 Blok 3: 4834/3977 m2 |
Area of floor per level: | Block 1: 632 m2 Block 2: 576 m2 Block 3: 778 m2 |
Area of floors for all levels: | Block 1: 3630 m2 Block 2: 3408 m2 Block 3: 4622 m2 |
Volume of concrete used: | Block 1: 1182 m3 Block 2: 1071 m3 Block 3: 1362 m3 |